About Roocroft Road Restraint Systems

Roocroft Road Restraint Systems has been trading since 1978 and was first incorporated in 1980.

 

The company initially carried out safety barrier, bridge parapets and general fencing works, later in 2006 we added the capability to provide slip formed safety barriers and concrete drainage channels.

 

The company has a highly skilled and well trained workforce of around 45 employees. All our plant and equipment is the most up to date and technically advanced to suit our operations.

 

We have an in house maintenance and fabrication division to ensure all our plant and equipment is well maintained and routinely inspected and certified.

 

The company operates throughout mainland Britain and has built a reputation for providing an excellent professional service, with a flexible approach and a willingness to genuinely work together to deliver a successful project for our clients.

 

Contact us

Company News

Mersey Gateway

 

The scheme started on 7th May 2014.  The scheme is to build a second road crossing over the Mersey. 

 

The second road crossing will be a new six-lane toll bridge between the towns of Runcorn and Widnes. 

 

The Mersey Gateway will bring much needed traffic relief for the existing Silver Jubilee Bridge and will lead the infrastructure investments required to deliver regeneration of Halton and the North West.  Currently, 80,000 vehicles use the Silver Jubilee Bridge, ten times the number it was originally designed for.

 

The main objectives of the scheme is to reduce the congestion over the Silver Jubilee Bridge, improve accessibility in order to maximise local development and regional economic growth for the area, improve public transport links, improve the air quality and general urban environment, increase the use of cycling and walking and restore effective network resilience for road transport over the River Mersey

Products

Concrete Vehicle Restraint System

We install N2, H2 and H4a rigid concrete barrier systems.

Concrete Vehicle Restraint System

Steel Vehicle Restraint System

Steel Vehicle Restraint System

We install N2, H1 and H2 Steel systems complete with terminals and crash cushions

Latest Projects

Mersey Gateway

The scheme started on 7th May 2014.  The scheme is to build a second road crossing over the Mersey. 

A19/A1058 Coast Road Junction Improvement Project

The aim of the scheme is to reduce congestion, increase capacity, improve road journey times, safety, support regeneration in the local area and maintain and improve facilities for the pedestrians and cyclists travelling along the route.

A556 Knutsford to Bowdon Scheme

The scheme is to construct a new 4.5 mile trunk road between Knutsford and Bowdon to create a modern dual carriageway road.